Runway Rubber Buildup: Causes, Challenges, and Safe Removal Techniques

Executive Summary

Every landing aircraft leaves behind a molecular signature on the runway, a thin film of rubber shed from high-speed tires. According to the Transportation Research Board (2012), each aircraft deposits about 700 grams of rubber per landing. At airports handling 500 daily movements, this can accumulate to over 350 kilograms every day within the touchdown zone. Over weeks and months, these deposits evolve into a stubborn, glossy film that severely reduces pavement friction, particularly during wet conditions when braking efficiency is most critical.

Runway rubber buildup has long been a safety and operational challenge for aviation authorities worldwide. With increasing traffic volumes and tighter scheduling windows, the problem is intensifying and traditional maintenance practices are no longer sufficient. Addressing it effectively requires both engineering precision and sustainability-driven innovation.

I. Understanding the Deposition Mechanism

The buildup begins the moment aircraft tires contact the runway surface at speeds ranging between 120 to 200 knots. In those initial seconds of touchdown, frictional heat causes tire tread temperatures to surge beyond 200°C, softening the rubber. The sudden shear stress between the tire and pavement transfers melted rubber onto the surface, not as visible chunks, but as microscopic smears that bond chemically with the aggregates.

This deposition primarily occurs in the touchdown zone, a narrow 900-meter stretch repeatedly targeted by landing aircraft. Consequently, rubber contamination is not uniform; it concentrates heavily in areas that already bear the greatest braking load. In high-traffic runways, some pavement sections receive ten to fifteen times more exposure than others, leading to premature texture loss exactly where friction is most needed.

Modern tire compounds, engineered for thermal stability and durability, inadvertently increase the challenge. Their polymers bond strongly to the pavement and once exposed to sunlight, oxidation and UV radiation, these deposits harden further. Environmental factors like freeze–thaw cycles and intense solar heating also drive rubber deeper into surface micro-voids, making it nearly inseparable from the pavement’s texture. Over time, new layers bond with old ones, creating a composite glaze that resists mechanical or hydraulic removal.

II. Operational and Safety Implications

Rubber buildup directly translates to reduced runway friction. Empirical studies have shown that friction coefficients can drop by 35–45% in heavily contaminated zones, especially during rainfall or when residual surface water remains. This degradation alters the aircraft’s braking dynamics and increases the likelihood of hydroplaning.

For pilots, the consequences are immediate and tangible, unpredictable directional control, longer stopping distances and greater dependence on reverse thrust to achieve deceleration. These conditions raise brake temperatures, accelerate tire wear and increase landing gear stress. On a systemic level, reduced runway friction impacts airline operations by forcing longer declared landing distances, reducing payload capacity and in some cases requiring diversion to alternate airports during adverse weather.

From an airport operator’s perspective, contaminated runways reduce operational availability and inflate maintenance costs. Frequent closures for cleaning disrupt slot management and increase turnaround times. The overall result is not just a safety concern but a measurable impact on airport efficiency, sustainability and financial performance.

III. Conventional Removal Methods and Their Limitations

The most widely used method for decades has been high-pressure water blasting, applying water at pressures between 10,000 and 40,000 PSI to shear rubber deposits off the surface. While effective in the short term, this technique comes with notable drawbacks. Repeated water blasting erodes pavement texture, especially along joints, cracks and previously distressed areas. Over time, this reduces surface integrity and accelerates the need for resurfacing.

Moreover, high-pressure water can inadvertently push fine contaminants deeper into the concrete matrix instead of fully removing them. The process is time-consuming, requiring 8 to 12 hours of runway closure for a full-length treatment, a significant operational cost for busy airports.

Environmental and sustainability concerns further limit this method’s long-term viability. Water blasting consumes large volumes of freshwater and generates contaminated runoff that must be treated before disposal. In water-stressed regions, this approach conflicts directly with broader environmental stewardship goals.

Chemical cleaning, another traditional approach, uses solvent-based agents to dissolve rubber deposits. Although effective initially, these chemicals can weaken the pavement binder and pose severe ecological hazards, leading many regulatory agencies to discourage or prohibit their use altogether.

IV. Modern and Sustainable Removal Solutions

Aviation authorities and airport operators are now transitioning from reactive cleaning cycles to predictive maintenance frameworks, where friction monitoring, targeted interventions and sustainability form the foundation of runway management.

The most promising approach begins with continuous friction testing. Vehicles equipped with Continuous Friction Measuring Equipment (CFME) measure friction in real time, producing detailed maps of pavement conditions. Instead of waiting for visible contamination, airports can now detect friction decline early and schedule localized interventions that minimize downtime and extend surface life.

Ultra-high-pressure (UHP) water systems represent the evolution of traditional blasting. These systems operate in the same pressure range but use refined nozzles, controlled flow rates and optimized water jets to remove rubber with greater precision and reduced surface wear. By targeting only contaminated areas and using less water per square meter, they balance efficiency with environmental responsibility.

Cryogenic cleaning is another innovation gaining momentum. Using liquid nitrogen or dry ice pellets, it rapidly cools and embrittles rubber deposits, allowing them to fracture and detach cleanly from the surface. This method eliminates chemical residues and drastically reduces water use, making it ideal for airports pursuing green certification or operating under tight environmental regulations.

Similarly, enzyme-based biological treatments use naturally derived agents that break down rubber polymers at the molecular level. Although slower-acting, these treatments can be applied during off-peak hours as part of a preventive routine, reducing the need for aggressive interventions.

ncreasingly, airports employ hybrid sequential cleaning strategies, combining methods depending on the age, thickness and distribution of contamination. For instance, enzyme treatments can soften deposits before cryogenic cleaning, followed by a controlled water pass for final polishing. This tiered approach minimizes surface erosion, reduces closure time and extends the pavement’s functional life.

V. Towards an Integrated Preventive Maintenance Model

Managing runway rubber buildup is no longer about periodic cleaning; it’s about integrating monitoring, planning, execution and verification into a continuous maintenance cycle.

The process begins with detection, using friction data, texture measurements and visual inspection to identify developing hot spots. This is followed by diagnosis, analyzing contamination type, depth and pattern to select the least aggressive yet most effective removal method. Maintenance planning should then prioritize risk-based scheduling, where critical touchdown zones are treated before conditions breach safety thresholds.

The execution phase involves selecting appropriate technology, be it UHP, cryogenic, or enzyme-based, and applying it under controlled conditions to ensure both friction recovery and surface preservation. Once the process is completed, post-cleaning verification using friction and texture testing ensures the pavement meets operational standards.

Finally, continuous data documentation enables long-term trend analysis. Airports that maintain accurate records of friction performance, treatment frequency and surface health can optimize maintenance budgets, demonstrate compliance to regulators and justify sustainability investments.

VI. The Engineering Perspective

Rubber buildup is not merely an operational inconvenience, it is a design and materials challenge that demands an engineering-led response. Future runway designs can significantly mitigate deposition through innovations such as photocatalytic aggregates, nano-textured binders and hydrodynamically optimized surfaces that resist polymer adhesion. When paired with smart monitoring and AI-enabled maintenance planning, these technologies can transform runway management from reactive maintenance into a predictive science.

The goal is clear: to preserve friction, protect assets and promote sustainability, ensuring that runways remain reliable, resilient and environmentally responsible despite increasing air traffic pressures.

Conclusion

Rubber contamination exemplifies the delicate balance between operational intensity and infrastructure longevity in modern aviation. The solution lies not just in cleaning but in re-engineering, shifting from episodic interventions to integrated systems of continuous measurement, targeted treatment and sustainable design.

“Rubber buildup is often treated as an operational nuisance when, in reality, it is a design problem waiting for an engineering solution. Pavement technologies that combine advanced aggregates, photocatalytic properties and hydrodynamic optimization can minimize deposition before it becomes a hazard. Investing in such innovation today ensures that the runways of tomorrow require less intervention and deliver greater safety consistency over their lifespan.”

- Roy Sebastian, CEO, GEMS